Quantcast
Home / photo / Fill-in work

Fill-in work

Eugene Hamp, operating engineer with Musson Bros. Inc., Rhinelander, uses a loader Monday to cover newly placed sewer pipe with stone in the 1900 block of South Calhoun Road in New Berlin. (Photo by David La Haye)

Eugene Hamp, operating engineer with Musson Bros. Inc., Rhinelander, uses a loader Monday to cover newly placed sewer pipe with stone in the 1900 block of South Calhoun Road in New Berlin. (Photo by David La Haye)

Leave a Reply

Your email address will not be published. Required fields are marked *

*