Quantcast
Home / photo / Cable ready

Cable ready

Sam Smith, a laborer with the city of Milwaukee, digs down to reach conduit Aug. 31 in the 3800 block of West Pierce Street, where crews are running cable for streetlights beneath the resurfaced street. (Photo by David La Haye)

Sam Smith, a laborer with the city of Milwaukee, digs down to reach conduit Aug. 31 in the 3800 block of West Pierce Street, where crews are running cable for streetlights beneath the resurfaced street. (Photo by David La Haye)

Leave a Reply

Your email address will not be published. Required fields are marked *

*