Quantcast
Home / photo / Backfill duty

Backfill duty

Mike Stanton, a front end loader operator for Underground Pipeline Construction Inc., New Berlin, backfills a trench Aug. 24 in the 1800 block of South 60th Street in West Allis. (Photo by David La Haye)

Mike Stanton, a front end loader operator for Underground Pipeline Construction Inc., New Berlin, backfills a trench Aug. 24 in the 1800 block of South 60th Street in West Allis. (Photo by David La Haye)

Leave a Reply

Your email address will not be published. Required fields are marked *

*