Quantcast
Home / photo / Bridge builder

Bridge builder

Jason Last of Radtke Contractors Inc., Winneconne, works on the metal structure Friday that will make up the Oak Leaf Trail pedestrian bridge and will span Capitol Drive in Shorewood. The 197-foot-long, 130,000-pound bridge is being assembled on the ground before it is lifted in place in one piece. LaLonde Contractors Inc., Milwaukee, is the general contractor on the project. (Staff photo by Kevin Harnack)

Jason Last of Radtke Contractors Inc., Winneconne, works on the metal structure Friday that will make up the Oak Leaf Trail pedestrian bridge and will span Capitol Drive in Shorewood. The 197-foot-long, 130,000-pound bridge is being assembled on the ground before it is lifted in place in one piece. LaLonde Contractors Inc., Milwaukee, is the general contractor on the project. (Staff photo by Kevin Harnack)

Leave a Reply

Your email address will not be published. Required fields are marked *

*