Quantcast
Home / Construction / Poe Shipping Lock closes temporarily for repair work

Poe Shipping Lock closes temporarily for repair work

SAULT STE. MARIE, Mich. (AP) — A shipping lock that enables cargo vessels to move between Lake Huron and Lake Superior has been closed temporarily for repairs.

Beverly McCready of the U.S. Army Corps of Engineers says the Poe Lock in Sault Ste. Marie, Michigan, was closed around 8 a.m. EDT Monday and is expected to reopen at 6:30 p.m.

She says concrete has eroded on a sill beneath one of the lock’s gates. Crews are installing concrete and steel plates as a stopgap measure and will do a complete repair this winter.

The Poe Lock is the only one of the Soo Locks that’s big enough for large vessels that carry iron ore used in steel manufacturing.

The construction of a second large lock is expected to begin next year, at a cost of nearly $1 billion.

Copyright 2019 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

Leave a Reply

Your email address will not be published. Required fields are marked *

*