Quantcast
Home (page 3)

Tag Archives: equipment

The OSHA report

OSHA reports • RJS Contracting, Milwaukee, must pay a $750 scaffolding citation and a $750 fall-protection citation because the period to contest the violations has ended. The company was issued the citations Sept. 10 during a roofing job at 2756 ...

Read More »

The OSHA report

OSHA reports • H2O Well Drilling and Pump Service LLC, Eau Claire, reached an informal settlement with OSHA on Oct. 28 to reduce a $4,200 personal-protective-equipment citation to $2,100. The company was issued the citation Oct. 22 during a water- ...

Read More »

The OSHA report

OSHA reports • Full Spectrum Building Components Inc., Edgerton, must pay a $375 fall-protection citation because the period to contest the violation has ended. The company was issued the citation May 24 during a framing job at 1821 Waterbend Drive, ...

Read More »

The OSHA report

OSHA reports • Havenwood Homes Inc., Wind Lake, must pay a $600 fall-protection citation because the period to contest the violation has ended. The company was issued the citation April 13 during a nonresidential building job at S76 W17587 Janesville ...

Read More »

The OSHA report

OSHA reports • Feaker & Sons Co. Inc., De Pere, reached an informal settlement with OSHA on April 20 to reduce a $450 head-protection citation to $200 and two specific-excavation-requirements citations, totaling $2,250, to $1,400. The company was issued the ...

Read More »

The OSHA report

OSHA reports •    Quality Express Roofing, Madison, must pay a $1,500 fall-protection citation, a $1,500 fall-protection-training citation and a $300 abatement-verification citation because the period to contest the violations has ended. The company was issued the citations Dec. 15 and ...

Read More »

The OSHA report

OSHA reports •    RLT Inc., North Prairie, reached an informal settlement with OSHA on Feb. 26 to reduce a $375 electrical-installation-safety-requirements citation to $262.50 and two electrical-wiring-methods citations, totaling $750, to $525. The company was issued the citations Feb. 25 ...

Read More »

The OSHA report

OSHA reports •    Design Structures LLC, Middleton, reached an informal settlement with OSHA on Nov. 4 to pay a $375 hazard-communication citation and reduce a $375 hand-and-power-tool citation to $187.50. The company was issued the citations Oct. 21 during a ...

Read More »