Please ensure Javascript is enabled for purposes of website accessibility
Home (page 2)

Tag Archives: forklift

The OSHA report (access required)

OSHA reports • Braves Drywall Inc., Brooklyn Park, Minn., must pay a $1,800 electrical-wiring-methods citation because the period to contest the violation has ended. The company was issued the citation May 31 during a specialty trade job at 623 Second ...

Read More »

The OSHA report (access required)

OSHA reports • Scott’s Pressure Washing Service, Muskego, reached an informal settlement with OSHA on March 2 to reduce a $4,200 aerial-lifts citation to $1,500. The company was issued the citation Feb. 17 during a finishing job at 400 N. ...

Read More »

The OSHA report (access required)

OSHA reports • JB Construction, Mauston, must pay a $400 abatement-verification citation because the period to contest the violation has ended. The company was issued the citation Jan. 21 following a residential remodeling job at 457 Netherwood St., Oregon. • ...

Read More »

The OSHA report (access required)

OSHA reports • Phoenix Construction, Kenosha, must pay a $1,400 rough-terrain-forklift citation and a $1,400 eye-and-face-protection citation because the period to contest the violations has ended. The company was issued the citations Dec. 21 during a framing job at 595 ...

Read More »

The OSHA report (access required)

OSHA reports • Southport Mechanical LLC, Kenosha, must pay a $600 fall-protection citation because the period to contest the violation has ended. The company was issued the citation Sept. 1 during a plumbing, heating and air conditioning job at 2121 ...

Read More »

The OSHA report (access required)

OSHA reports • Gonzalez Construction LLC, Chicago, must pay a $750 fall-protection citation because the period to contest the violation has ended. The company was issued the citation June 3 during a roofing job in Racine. • Hill Construction, Edgar, ...

Read More »

The OSHA report (access required)

OSHA reports • Full Spectrum Building Components Inc., Edgerton, must pay a $375 fall-protection citation because the period to contest the violation has ended. The company was issued the citation May 24 during a framing job at 1821 Waterbend Drive, ...

Read More »

The OSHA report

OSHA reports •    RLT Inc., North Prairie, reached an informal settlement with OSHA on Feb. 26 to reduce a $375 electrical-installation-safety-requirements citation to $262.50 and two electrical-wiring-methods citations, totaling $750, to $525. The company was issued the citations Feb. 25 ...

Read More »