Please ensure Javascript is enabled for purposes of website accessibility

Mequon Road

Jul 26, 2014

Meeting set for Highway 57, Brown Deer Road intersection project

The Wisconsin Department of Transportation will hold a meeting July 30 to discuss planned improvements to Highway 57’s interchange with Brown Deer Road in Milwaukee County.

Dec 12, 2013

WisDOT to host planning meeting for Mequon Road

The Wisconsin Department of Transportation will host a public information meeting Thursday to discuss a planning study for Mequon Road between Pilgrim and Wauwatosa roads in Germantown and Mequon.

Aug 13, 2013

Meeting set for Highway 145 road project

The Wisconsin Department of Transportation will hold a public meeting Aug. 22 to discuss the preliminary design to resurface Highway 145 from Mequon Road to Fond du Lac Avenue in Germantown.

Oct 5, 2009

High-pressure duty

[caption id="attachment_33193" align="alignnone" width="400" caption="Shaun Fry, a laborer for EBI Drilling Inc., Duluth, Minn., uses a high-pressure water jet to loosen earth before a water main is installed Sept. 10 along Highway 57 a few blocks south of Mequon Road in Mequon. EBI Drilling was subcontracted to replace sections of the water main. The company uses hydro-excavating in which the ear[...]

Polls

Is the labor shortage getting:

View Results

Loading ... Loading ...

Today’s News

See All Today's News

Project Profiles

See All Project Profiles